In England, you usually don't need planning permission to replace the roof on a house, as long as you're re-roofing like for like or with similar-looking materials and not changing its height or shape. Planning permission is more likely to be needed if you live in a listed building, a conservation area or a flat, if your council has removed permitted development rights, or if you're raising the roof, adding a dormer or changing a flat roof to a pitched one. Planning permission and Building Regulations are separate, though: a full re-roof will normally need Building Regulations approval even when planning permission isn't needed.
This guide explains the rules for England in plain English. Rules in Scotland, Wales and Northern Ireland differ. Planning rules can change and every property is different, so always check with your local council before you start.
Re-roofing like for like
Replacing worn tiles or slates with the same or very similar materials doesn't change how the house looks, so for most houses it doesn't need planning permission at all. The same goes for ordinary repairs: replacing slipped tiles, re-bedding a ridge, renewing flashings or replacing gutters.
Changing to a noticeably different material, for example from natural slate to concrete tiles, is usually still fine on a house that isn't listed or in a conservation area. But it can need permission where an Article 4 direction applies (see below), and the new covering must not be much heavier than the roof was built for without a structural check.
Permitted development: what you can do without permission
Houses (not flats or maisonettes) in England have permitted development rights, which allow some changes to be made without a planning application. For roofs, the main ones are:
- Rooflights and other roof alterations are usually permitted if they don't stick out more than 150mm from the roof slope, aren't higher than the highest part of the roof, and any side-facing windows are obscure-glazed and non-opening unless the opening part is more than 1.7m above the floor.
- Roof extensions such as rear dormers can be permitted development within limits: no extension on the roof slope facing the road at the front, no higher than the existing roof, and an added volume of no more than 40 cubic metres for terraced houses or 50 cubic metres for detached and semi-detached houses. Materials should be similar in appearance to the house.
These rights don't apply everywhere, and some houses have had them removed by an earlier planning condition, so check before relying on them.
When you will probably need permission
- Raising the roof or changing its shape, such as a hip-to-gable change outside permitted development limits, raising the ridge, or turning a flat roof into a pitched one.
- A front dormer, or any roof extension over the permitted development limits.
- Flats and maisonettes, which don't have the same permitted development rights as houses.
- Conservation areas and Article 4 directions (see below).
- Listed buildings, which need listed building consent (see below).
Conservation areas and Article 4 directions
In a conservation area, permitted development rights are reduced. Roof extensions such as dormers need planning permission, and the council will pay close attention to materials and appearance. Many councils also use Article 4 directions to remove specific permitted development rights in an area. These often cover things like changing the roof covering, adding rooflights on the front slope or altering chimneys. If an Article 4 direction applies, even swapping slate for tiles can need permission. Your council's website lists its conservation areas and any Article 4 directions.
Listed buildings
If your home is listed, you'll need listed building consent for any work that affects its character, and a roof almost always does. That can include re-roofing, changing materials, altering chimneys and adding rooflights. Even like-for-like repairs are best discussed with the council's conservation officer first. Carrying out unauthorised work to a listed building is a criminal offence, so this is one to get right before any work starts. You can check whether a building is listed on Historic England's National Heritage List.
Building Regulations: a separate question
Building Regulations cover how the work is done: structure, fire safety, insulation and ventilation. They apply whether or not you need planning permission.
- Re-roofing more than a quarter of the roof normally needs Building Regulations approval.
- Insulation: when most of a roof is renewed, the insulation usually has to be brought up to current standards, where that's practical.
- Weight: if the new covering is significantly heavier than the old one, the roof structure must be checked and may need strengthening.
- Rooflights and dormers that involve cutting rafters need approval for the structural work.
A roofer registered with a government-authorised competent person scheme can self-certify qualifying re-roofing work and arrange the certificate for you. Otherwise, the job goes through your council's building control team or an approved inspector. Either way, keep the certificate: you'll need it when you sell.
Quick guide: planning permission and Building Regulations for roof work
| Work (on a house) | Planning permission? | Building Regulations? |
|---|---|---|
| Repairs (tiles, ridge, flashing, gutters) | No | Not usually |
| Like-for-like re-roof | Not usually | Yes, if over 25% of the roof |
| Re-roof in a different material | Not usually; check if in a conservation area or Article 4 area | Yes, if over 25%; structure checked if heavier |
| Rooflights / skylights | Not usually, within the 150mm and height limits | Usually, if rafters are cut |
| Rear dormer / loft conversion | Often permitted development, within limits | Yes |
| Replace a flat roof, same height and shape | Not usually | Yes, if over 25% |
| Flat roof to pitched roof | Usually yes | Yes |
| Any work to a listed building | Listed building consent | Usually |
This table is a general guide for houses in England, not legal advice. If your property is a flat, listed, in a conservation area or covered by an Article 4 direction, check with your council.
Other things to check
- Bats. Bats and their roosts are protected by law. If you know or suspect bats use your roof, you may need a bat survey and a licence before work starts. Natural England has guidance.
- Party walls. On terraced and semi-detached houses, work that cuts into or raises a party wall may come under the Party Wall etc. Act 1996, which means notifying your neighbours.
- Leasehold and covenants. If you're a leaseholder, or your deeds carry restrictive covenants, you may need permission from the freeholder or another party, even when the council doesn't need to be involved.
How to check with your council
Start with the Planning Portal's guidance on roofs, then contact your local planning authority. Across our area that means councils such as Chelmsford, Basildon, Southend-on-Sea, Colchester, Brentwood, Epping Forest and Thurrock in Essex, and the London Boroughs of Havering, Redbridge, Barking and Dagenham, Waltham Forest and Newham. Many offer pre-application advice. If you want written certainty that a project doesn't need permission, you can apply for a Lawful Development Certificate, which is also useful when you come to sell.
Planning a new roof?
We'll survey your roof for free, explain the options and give you a fixed, written quote. If you're changing the look, shape or material of your roof, we'll flag anything you should check with the council before you commit. See our new roofs, pitched roofing and skylights and roof windows pages, or read signs you need a new roof if you're still deciding.