What a dry ridge and verge system is
The ridge is the row of capping tiles along the very top of a pitched roof. The verge is the edge of the roof where the tiles stop at a gable wall. For decades, both were simply bedded in sand and cement mortar. Mortar does the job for a while, but it's brittle. Frost, summer heat and the small movements every roof makes slowly crack it, shrink it away from the tiles and wash it out. Once that happens, a ridge tile is held on by little more than its own weight, and a strong gust can lift it off.
A dry system does away with mortar as the fixing. Ridge and hip tiles are screwed or clipped down to a timber batten or metal bracket running along the apex, with a roll-out ventilated strip sealing the gap underneath. At the gable ends, interlocking verge caps or a continuous verge trim clip over the edge tiles and fix back into the battens. There's nothing to crack, nothing to wash out, and very little to maintain.
It's also the way roofs are expected to be built now. The British Standard for slating and tiling (BS 5534) was revised in 2014 so that ridge and hip tiles shouldn't rely on mortar alone to stay in place. Mortar can still be used alongside mechanical fixings, but a dry system is the simplest way to meet it.
Signs your ridge or verge needs attention
- Ridge tiles that look out of line, have lifted at one end, or rock when the wind gets up.
- Lumps of old mortar on the drive, in the gutters or on a flat roof below.
- Daylight-sized gaps between the ridge tiles and the tiles underneath.
- Cracked or missing mortar along the gable edge, so you can see the board or felt underneath.
- Damp patches high up on a gable wall, or water marks in the loft along the line of the ridge.
- Birds, wasps or bees getting in under the ridge or at the verge.
A single loose ridge tile can weigh several kilos. If you think one is about to come off, keep people and cars away from that side of the house and call us for an emergency repair.
How we fit a dry ridge, step by step
- Survey and photos. We check the ridge, hips and verges up close and photograph what we find, so you see the cracked mortar and loose tiles for yourself.
- Lift the old ridge. Each ridge tile is lifted carefully and the old mortar knocked off. Sound tiles are cleaned and reused; any that are cracked are replaced with a match.
- Fix the ridge batten. A treated batten (or a metal bracket system) is fixed along the apex at the right height for your tiles.
- Lay the ventilated roll. A breathable roll is dressed onto the tiles on both slopes. It keeps rain and snow out while letting moist air escape from the roof space.
- Screw down every tile. Each ridge tile is fixed through to the batten with a clip or screw and sealed washer, with unions over the joints and end caps where the ridge finishes.
- Clear up. Every bit of old mortar and packaging goes in our van, not your bin.
Dry verge at the gable end
For a dry verge we rake out the loose mortar, check the undercloak board along the edge, and fit verge units from the eaves up to the ridge, each one fixed into the tile battens. Most systems come in colours to suit common tiles, such as black, brown, grey and terracotta, and we'll bring samples if you're unsure.
A dry verge isn't right for every house. On some period properties, slate roofs or homes in a conservation area, re-bedding the verge in mortar (with mechanical fixings) keeps the original look and may be what the council expects. We'll tell you honestly which suits your roof.
What affects the cost
- The length of the ridge, and how many hips run down from it.
- How many gable verges need doing.
- Whether your existing ridge tiles can be reused, or replacements need to be sourced to match.
- Access. A bungalow can often be done from roof ladders; a two-storey house usually needs scaffold or a tower.
- Whether the batten or tiles near the ridge need repair once the old mortar is off.
- Whether it's done alongside other work, such as roof repairs or a new chimney flashing, while access is already up.
We survey for free and give you a fixed written price, with photos, before any work starts.
How long it takes
On a typical house, a dry ridge is usually one to two days' work once access is in place, and each verge usually adds about another day. Weather can move the start date, because we won't lift a ridge with rain forecast.
Aftercare
A dry system needs very little looking after. After a big storm, it's worth a look from the ground to check every cap is still in line. Keep the ventilated strip clear of moss, and if you ever see a tile out of place, send us a photo. If you're not sure what state the rest of the roof is in, ask us to do a full roof inspection at the same visit.